Sign In | Join Free | My burrillandco.com
Home > Tunnel Mucking Loader >

Continuous Mining Machine

Shandong Shante Heavy Industry Machinery Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Continuous Mining Machine from wholesalers
     
    Buy cheap Continuous Mining Machine from wholesalers
    • Buy cheap Continuous Mining Machine from wholesalers

    Continuous Mining Machine

    Ask Lasest Price
    Price : negotiate
    Certification : ISO
    Brand Name : Shante
    Payment Terms : negotiate
    Delivery Time : 5-8 day
    • Product Details
    • Company Profile

    Continuous Mining Machine

    Continuous Mining Machine

    Starting

    Before the mucking loader is started, ensure that the driver is familiar with the operation manual, especially the chapter "general safety rules". Before starting, check whether all the levers are in the neutral position (stationary position), so that there are no unexpected action when the equipment is started. During the function test, the irrelevant personnel (except the operator) are not allowed to enter the working area of the mucking loader, otherwise they may be easily injuried!

    Turn on the power master switch and then press the motor start button.

    The loader is equipped with phase sequence protector which can avoid machine damages caused by motor reversal due to wrong phase sequence. If the loader cannot be started, please first change any two-phase wire connections of power supply and then restart it.

    The hydraulic pump shall be exhausting again.

    When the hydraulic system is exhausting, no one is allowed to be located within the scope of movement work of the working mechanism and the transport mechanism. Because the working mechanism and the transport mechanism may have unexpected movements, it may lead to serious injuries.

    The exhausting of hydraulic system is achieved through several movements of hydraulic actuator.

    Check the leakage of hydraulic system.

    After 10-second startup is completed, the machine can be used with pressure. When the machine is shut down for more than 4 hours, the pump shall be idling for 5 ~ 10 minutes before the machine is working with pressure.

    General drawing:

    118 拷贝

    Continuous Mining Machine

    Quality Continuous Mining Machine for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Shandong Shante Heavy Industry Machinery Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)